Third Party Control - NDT
Third-Party Quality Control Services Continue at the Chlor-Alkali & Hydrogen Peroxide (H₂O₂) Plant in Çankırı Yakınkent Organized Industrial Zone As TOYA Quality Engineering, we are…
More
WELDING PROCEDURE SPESIFICATION RECORT
Successful Completion of WPQR Qualification and Welder Certification Services for GalvaSteel LLC in Kosovo TOYA Quality Engineering successfully provided Welding Procedure Qualification Record (WPQR) and…
More
SECOND PARTY CONTROL - NDT
Successful Quality Control of 25 km of Welded Joints for a Six-Effect Evaporation Project As TOYA Quality Engineering, we provided Second-Party Quality Control and Inspection…
More
Piping Project Field Inspection
Paint workshop stock tanks piping project controls for which we run thethird party project.
More
Heat Exchanger Field Inspection
Soda Production Plant carried out by second part Material: 316 L
More